tweetindex
ID

CrossCountry Trains

@CrossCountryUK · 112 stations across Britain · joined 08 Jun 2010

We’re here for you 24/7. DM us your questions or queries. Here’s some links to help get you on your way: https://t.co/5m8R1rOsfP

102 814Followers
199Following
352 818Posts total
20.2KViews on collected posts

Postingan terbaru

NEW: Due to trespassers on the railway at Tamworth Hl, all lines are blocked. Train services running through this station may be cancelled, delayed by up to 30 minutes or diverted via Lichfield City. Wilnecote and Tamworth Hl will not be served: https://t.co/UI1q9ruCPT https://t 3.5K views · 3 likes · 2 reposts · 0 replies Open on X →
@CrossCountryUK That's a bit Long isn't it? 88 views · 0 likes · 0 reposts · 0 replies Open on X →
NEW: Due to a points failure between Long Eaton and Beeston, all lines are blocked. Services may be delayed or terminated at and start back from Derby. Spondon, Long Eaton, Beeston, Attenborough and Nottingham will not be served: https://t.co/UI1q9ruCPT https://t.co/qZNiCnSxPr 3.9K views · 1 likes · 2 reposts · 1 replies Open on X →
NEW: Due to a speed restriction over defective track between Worcestershire Parkway Ll and Ashchurch For Tewkesbury the Northbound line is blocked. Train services running through these stations may be delayed. Please see here for more information: https://t.co/UI1q9ruCPT https: 3.3K views · 0 likes · 0 reposts · 0 replies Open on X →
NEW: Due to a fault with the signalling system between Cheltenham Spa - Bristol Parkway all lines are blocked Train services running through these stations will be cancelled, delayed or diverted via Severn Tunnel Jn. Please see here for more information: https://t.co/UI1q9ruCPT 3.6K views · 1 likes · 2 reposts · 1 replies Open on X →
CLEARED: Following the a broken rail between Gloucester and Lydney, all lines have now reopened. If you were delayed by 30 minutes or more, please claim Delay Repay compensation via: https://t.co/rUnkC1sVav https://t.co/hCLsn6lWSv 1.6K views · 0 likes · 0 reposts · 1 replies Open on X →
Disruption: Due to a broken rail between Gloucester and Lydney, all lines are blocked. Train services running through these stations may be cancelled or delayed. Please see alternative travel arrangements here: https://t.co/UI1q9ruCPT https://t.co/C5hB8ZpvjQ 4.1K views · 1 likes · 1 reposts · 1 replies Open on X →

Dibandingkan akun berukuran sama

7 postingan dari 90 hari terakhir, dibandingkan dengan rentang 100K–1M pengikut. tampil luas, tetapi sedikit penonton yang merespons.

Median tayangan3 533akun ini5 983median untuk 100K–1M
Jangkauan, %3.44%akun ini1.49%median untuk 100K–1M
Interaksi, %0.07%akun ini0.93%median untuk 100K–1M
MetrikAkun iniMedian untuk 100K–1MRasio
Median tayangan per postingan3 5335 9830.59×
Jangkauan (tayangan ÷ pengikut)3.44%1.49%2.31×
Tingkat interaksi0.07%0.93%0.08×

Akun lain pada rentang ini →   Bandingkan dengan akun lain →   Bagaimana tolok ukur ini disusun →

Growth & engagement

How the posts we collected actually performed: views and reaction rate post by post, what the audience did with them, and where the follower count goes.

Views per post

4.1K31 Aug
1.6K
3.6K1 Sep
3.3K
3.9K
88
3.5K

Last 7 collected posts, oldest on the left. The scale is logarithmic: one post can outrun the rest a hundred times over.

Engagement rate per post

0.07%31 Aug
0.06%
0.11%1 Sep
0.00%
0.10%
0.00%
0.14%

Reactions — likes, reposts, replies and quotes — divided by views. Median for 100K–1M accounts is 0.93%.

What the audience does

Likes35.3%6 in total
Reposts41.2%7 in total
Replies23.5%4 in total

Share of every reaction we collected for this account. Replies mean argument, reposts mean endorsement, bookmarks mean the post was worth keeping.

The follower curve appears once this account has two daily snapshots — we take one a day, and this one is on its first.

Akun serupa