15. After the first floor, the other floors are done repetitively, shutters, slab reinforcement, concreting, columns erction, formwork, concreting, taking care of sizes, and drawings all the way to 6th floor . 10/10/24 to date on the final floor before wallings https://t.co/eefF4up4BG