Emmet Peppers @EmmetPeppers · 29 Aug 2026
@TeslaBoomerMama SpaceX and Tesla are each building 100GW/year of solar production capacity as fast as possible, but natural gas will still be needed to supplement and bootstrap solar for several years. The limiting factor for nat gas turbine production is casting the blades & vanes. By doing
3 247 285Views
21 665Likes
1 833Reposts
863Replies
386Quotes
0Bookmarks
Is that a lot?
180×vs this author's median18 041 views is typical
86Percentile for this authorof 7 recent posts
853×vs 10K–100K median3 808 views is typical
34.4× audienceReachviews ÷ followers
0.76%Engagement rateof viewers reacted