tweetindex

StorX - Storage DePIN Powered by XDC @StorXNetwork · 31 Aug 2026

5 gigawatts is Meta's expanded target for its Hyperion campus in Louisiana, backed by a $27 billion joint venture with Blue Owl and 10 dedicated gas plants. Phase one energized in June 2026, two years after construction began. Filecoin runs today, no buildout required. https://t.co/MbsWmkipo6
64 605Views
106Likes
17Reposts
33Replies
1Quotes
0Bookmarks

Is that a lot?

4.00×vs this author's median16 140 views is typical
78Percentile for this authorof 9 recent posts
27.0×vs 10K–100K median2 392 views is typical
3.2× audienceReachviews ÷ followers
0.24%Engagement rateof viewers reacted

Compare with the benchmark table →

Open on X →