tweetindex

Hiren

@BHiren · Mumbai, India · joined 10 Dec 2009

Infra & Industrial Updates. India First.

12 979Followers
58Following
26 617Posts total
841.7KViews on collected posts

Against accounts of the same size

6 posts from the last 90 days, next to the 10K–100K follower range. shown to more people than peers of the same size.

Median views1 706this account980median for 10K–100K
Reach, %13.14%this account3.27%median for 10K–100K
Engagement, %1.67%this account2.01%median for 10K–100K
MetricThis accountMedian for 10K–100KRatio
Median views per post1 7069801.74×
Reach (views ÷ followers)13.14%3.27%4.02×
Engagement rate1.67%2.01%0.83×

Others in this range →   Compare with another account →   How these benchmarks are built →

Growth & engagement

How the posts we collected actually performed: views and reaction rate post by post, what the audience did with them, and where the follower count goes.

Views per post

688.9K12 Jan
18.3K
68.8K
44.1K
2.2K31 Aug
1.2K
746
13.3K1 Sep
3.2K
934

Last 10 collected posts, oldest on the left. The scale is logarithmic: one post can outrun the rest a hundred times over.

Engagement rate per post

1.14%12 Jan
0.69%
1.02%
0.73%
2.52%31 Aug
2.27%
1.07%
1.06%1 Sep
4.28%
1.07%

Reactions — likes, reposts, replies and quotes — divided by views. Median for 10K–100K accounts is 2.01%.

What the audience does

Likes84.6%8 179 in total
Reposts10.2%985 in total
Replies1.5%145 in total
Quotes0.9%86 in total
Bookmarks2.8%269 in total

Share of every reaction we collected for this account. Replies mean argument, reposts mean endorsement, bookmarks mean the post was worth keeping.

Followers by day

5 Sep

Daily snapshots since 05 Sep 2026; the dashed line is the starting count.

Latest posts

Superb 👌🏼 934 views · 10 likes · 0 reposts · 0 replies 01 Sep 2026 · Open on X →
One more reason for MMRDA to expedite Metro L4, L5 & L14 to ease crowding on CR. Meanwhile, MMRDA: cancels GC (civil works) tender for the imp. Line 5A (spur to Ulhasnagar) #GemsofMMRDA 3.2K views · 115 likes · 17 reposts · 5 replies 01 Sep 2026 · Open on X →
Mumbai’s #suburbanrailway lost nearly 45 lakh passengers in April-June, while parallel #Metro corridors recorded 3.91 crore rides. AC Local ridership, however, surged nearly 30%. #Mumbai #MumbaiLocal #MumbaiMetro #localtrain @fpjindia https://t.co/oI8d9iJItq 13.3K views · 113 likes · 11 reposts · 10 replies 01 Sep 2026 · Open on X →
Doomsayers were doomed and India bloomed…yet again.. 😅 746 views · 8 likes · 0 reposts · 0 replies 31 Aug 2026 · Open on X →
जय बाबा केदारनाथ 🙏🏼 1.2K views · 26 likes · 1 reposts · 0 replies 31 Aug 2026 · Open on X →
Sonprayag-Kedarnath Ropeway: Construction Update Rock testing work has started on the 12.9 km Sonprayag-Kedarnath ropeway, but major construction is still in the early stage. Cost: ₹4,081 crore Technology: 3S tri-cable gondola Work awarded and concession agreement signed http 2.2K views · 44 likes · 11 reposts · 0 replies 31 Aug 2026 · Open on X →
@BHiren 90% work done only by present govt. Modi hai toh mumkin hai 👍👍👍🙏🙏 44.1K views · 307 likes · 7 reposts · 6 replies 12 Jan 2024 · Open on X →
@BHiren Congresses will say " it's good we didn't build it that time.....otherwise it would have gotten old & rotten by now...." 68.8K views · 682 likes · 11 reposts · 8 replies 12 Jan 2024 · Open on X →
@BHiren True other countries had such infra projects completed in 80s and 90s. And there are lot more such projects. 18.3K views · 125 likes · 2 reposts · 0 replies 12 Jan 2024 · Open on X →
Atal Bihari Vajpayee Setu (MTHL) Timeline 1972 – First proposed 1981 – Recommendation by JRD Tata 1984 – Approved by PMO 2004 – Project revived 2008 – RInfra “won” the contract but later cancelled 2015 – Project revived 2016 - PM Modi Laid Foundation Stone 2017 – Contract http 688.9K views · 6.7K likes · 925 reposts · 116 replies 12 Jan 2024 · Open on X →

Similar accounts