tweetindex

Deepender Singh Hooda

@DeependerSHooda

हरियाणा का बेटा । रोहतक सांसद । सदस्य, कांग्रेस कार्यसमिति Member of Parliament (5th Term)

588 807Followers
1 523Following
26 949Posts total
569.3KViews on collected posts

Against accounts of the same size

5 posts from the last 90 days, next to the 100K–1M follower range. reaches fewer people than peers of the same size.

Median views1 428this account4 257median for 100K–1M
Reach, %0.24%this account1.61%median for 100K–1M
Engagement, %1.51%this account1.31%median for 100K–1M
MetricThis accountMedian for 100K–1MRatio
Median views per post1 4284 2570.34×
Reach (views ÷ followers)0.24%1.61%0.15×
Engagement rate1.51%1.31%1.15×

Others in this range →   Compare with another account →   How these benchmarks are built →

Growth & engagement

How the posts we collected actually performed: views and reaction rate post by post, what the audience did with them, and where the follower count goes.

Views per post

345.9K2 Sep
219.6K3 Sep
1.2K
1.4K
1.3K

Last 5 collected posts, oldest on the left. The scale is logarithmic: one post can outrun the rest a hundred times over.

Engagement rate per post

0.36%2 Sep
1.79%3 Sep
1.51%
1.40%
4.78%

Reactions — likes, reposts, replies and quotes — divided by views. Median for 100K–1M accounts is 1.31%.

What the audience does

Likes74.9%4 011 in total
Reposts14.9%800 in total
Replies7.3%391 in total
Quotes1.1%60 in total
Bookmarks1.7%93 in total

Share of every reaction we collected for this account. Replies mean argument, reposts mean endorsement, bookmarks mean the post was worth keeping.

The follower curve appears once this account has two daily snapshots — we take one a day, and this one is on its first.

Latest posts

@DeependerSHooda 24 Inches waale Aaloo Scientist Hooda Ji , Fact checking you 😂😂😂😂😂. Kabhi Toh Saach Bolo @NayabSainiBJP https://t.co/zfWDGgwSZr 1.3K views · 54 likes · 5 reposts · 1 replies 03 Sep 2026 · Open on X →
@DeependerSHooda “I am thinking of going to Mars but if tomorrow someone gets there before me, I will take credit for the idea.” - Congress Philosophy FACT CHECK: First, the original construction plan was just an at-grade ground level highway, not an elevated expressway with mu 1.4K views · 18 likes · 2 reposts · 0 replies 03 Sep 2026 · Open on X →
@DeependerSHooda 78% work completed ???? What a joke 🤣🤣🤣🤣 1.2K views · 18 likes · 0 reposts · 0 replies 03 Sep 2026 · Open on X →
CM sahab, 🚨 FACT CHECK 🚨 Yes this is DWARKA EXPRESSWAY The entire project, costing ₹7,500 crore, began being planned in 2006 (UPA-1, Hooda ji led INC govt) Land acquisition started in 2007-08 (UPA-1+ Hooda ji led INC govt) Work Contract awarded to Agencies on 1 April 219.6K views · 3.1K likes · 606 reposts · 199 replies 03 Sep 2026 · Open on X →
ये AI नहीं, बल्कि द्वारका एक्सप्रेसवे है। दिल्ली से गुरुग्राम तक 29.1 किलोमीटर लंबा, 16 लेन का द्वारका एक्सप्रेसवे भारत का पहला शहरी एलिवेटेड हाईवे है। 🇮🇳 https://t.co/9Rqele0SgF 345.9K views · 844 likes · 187 reposts · 191 replies 02 Sep 2026 · Open on X →

Similar accounts